TIC - Laydown Concrete Column Skip

Our most popular concrete skip.  The TIC is a robust and extremely versatile rollover skip.  Designed to be laid horizontally to be filled and back to vertical for pouring.

Product details

The column skip is designed to enable concrete to be poured into narrow shuttering or columns.  Standard sizes from 350 litres to 3,500 litres.


USE: The column skip is supplied with the option of a bale arm or lifting rings:

  • When filling, the skip is laid on the ground where it is low enough to be filled from a concrete lorry
  • When pouring the skip is lifted vertically into position
  • Gate operation is by means of a nylon rope attached to a spring return lever for the TI gate

FEATURES:

  • TI Gate: Lever operated gate mechanism for upright and laydown concrete skips with an anti-leakage dismountable cone.
  • Bale arm for ease of use
  • Heavy duty construction
  • Delivered with a 3m long hose, 200mm diameter as standard.
  • Forklift pockets for easy transportation around site
  • Skips with capacity of 1000L and above are also fitted with an auxiliary gate closing rope for ease of gate closure.

OPTIONS:

  • Lifting rings (PF) instead of bale arm for reduced weight and increased safety
  • Radio remote operated gate
  • Wheel operated geared gate
  • Alternative hose diameter / lengths
  • Offset chute discharge version (TIC D) allowing concrete to be poured against walls